Invoice template
Roofing invoice template
A roofing invoice template for multi-day jobs: deposits, progress billing and material deliveries itemized so homeowners understand each payment.
Updated · By PayToMe Editorial
Roofing invoice
| Description | Qty | Amount |
|---|---|---|
| Tear-off of existing shingles, one layer | 24 sq | $1,320.00 |
| Architectural asphalt shingles, installed | 24 sq | $7,440.00 |
| Synthetic underlayment | 24 sq | $672.00 |
| Ice and water shield, valleys and eaves | 6 roll | $432.00 |
| Drip edge, 10 ft sections | 30 ea | $285.00 |
| Pipe boot flashing replacement | 3 ea | $135.00 |
| Plywood decking replacement | 4 sheet | $312.00 |
| Dumpster and debris haul-away | 1 ea | $525.00 |
| Total | $11,121.00 | |
Typical terms for this trade: Net 7 or Net 15 or Net 30
A roofing invoice template needs more structure than most trades because a roof job is rarely one visit and one payment. A replacement can take several days, materials arrive in a delivery before work starts, and the final scope is not fully known until the old shingles are off. This page explains how to build roofing invoices around deposits, progress payments and change items, what to include, which terms are common and the mistakes that cause disputes. The “Use this template” button on this page opens the free generator with the sample lines prefilled, so you can adjust quantities and prices to your job.
Why roofing bills differently
Roofing has three money problems that smaller trades rarely face.
Materials are large and arrive early. A load of shingles, underlayment and flashing can cost thousands of dollars before the first shingle comes off. Contractors commonly ask for a deposit to cover materials, and the invoice should make that deposit visible and easy to credit later.
The job is measured in squares. Roofers price by the square, which is 100 square feet of roof area. Using the unit on the invoice, such as “24 sq,” lets homeowners compare it to the quote and to other bids.
Surprises are normal. Soft or rotted decking, damaged flashing and hidden layers appear only after tear-off. A clear price per sheet for decking replacement, agreed in advance, turns a surprise into a routine line item.
The job also often crosses the line between a small repair and a project. A leak patch is billed like a service call. A full replacement behaves like a construction project, with staged payments and a written contract.
What to include on a roofing invoice
Use the baseline from our guide to what to include on an invoice and add the roofing specifics.
- Business name, address, phone, and license and insurance details where your state or city requires them. Rules differ, so check locally.
- Property address and the contract or quote number.
- Scope summary: tear-off layers, shingle type and color, underlayment, flashing, ventilation and cleanup.
- Measured area in squares, with the unit price per square for tear-off and installation.
- Materials on their own lines when they are significant: underlayment, ice and water shield, drip edge, vents.
- Change items: decking replacement, extra flashing, chimney work, each with quantity and unit price.
- Disposal and cleanup, such as dumpster and magnet sweep of nails.
- Deposit and prior payments, shown as credits.
- Balance due, payment terms and accepted methods.
- Warranty note: workmanship period you provide, and a pointer to the manufacturer’s shingle warranty if applicable.
- Tax, following local rules. Our guide to how to add sales tax to an invoice has general pointers.
A worked multi-stage roofing example
A homeowner signs a contract for a 24-square replacement. The contractor sends three invoices: a deposit when materials are ordered, a progress invoice at tear-off complete, and a final invoice after cleanup. The example below shows the full job value with extra decking added after tear-off. On the real final invoice, the deposit already received would appear as a credit, and only the remaining balance would be due.
INV-4410 · Roof replacement, full value
| Item | Qty | Amount |
|---|---|---|
| Architectural shingles, installed, 24 sq | 24 | $7,440.00 |
| Tear-off, 24 sq | 24 | $1,320.00 |
| Synthetic underlayment, 24 sq | 24 | $672.00 |
| Plywood decking replacement (extra) | 4 | $312.00 |
| Dumpster and haul-away | 1 | $525.00 |
| Total | $10,269.00 | |
Whether tax applies to roofing work varies by state, so the example uses zero. Apply the rules for your location.
Deposits and progress billing
Think of a roofing job as milestones. A common pattern is:
- Deposit when the contract is signed or materials are ordered. See deposit invoice for how it appears on paper.
- Progress payment when materials are delivered or tear-off is complete.
- Final payment on completion, after cleanup and any walkthrough.
The glossary entry on progress billing describes the approach. The exact split is a business decision, and some states limit how large a deposit can be on home improvement work, so check local rules before you set yours.
Whatever split you choose, show prior payments as credits on every later invoice. A homeowner who sees “Contract total, less payments received, balance due” never has to wonder where they stand.
Payment terms that work for roofers
Residential customers are usually asked to pay the final invoice on completion or within 7 days. Commercial work and property managers more often use net 15 or net 30. Our guide to invoice payment terms explains how to phrase each. If a customer is waiting on an insurance check, note the expected timing in the contract instead of leaving the invoice open-ended.
If you add late fees, state the rate and grace period in the contract and on the invoice, and check local rules. The late fee calculator shows what a given rate would add.
Pricing and itemizing tips
- Price by the square, then add exceptions. A clean per-square base with explicit extras reads better than one lump sum.
- Agree on unit prices for unknowns before the job starts: decking per sheet, flashing per linear foot, chimney repair per hour.
- List delivery separately if you charge for it, especially when materials arrive days before work.
- Photograph before and after. Photos of rotted decking justify extra lines without argument.
- Mention what is not included, such as gutters, skylights or interior repairs.
Common mistakes
- Not crediting the deposit on the final invoice.
- Adding decking or flashing without telling the customer until the bill arrives.
- Using calendar dates instead of milestones for progress invoices.
- Leaving out the shingle brand and color, which matters for warranties and for matching later.
- Mixing a repair and a replacement on a single invoice.
- Skipping the warranty note. Customers look for it.
Checklist before you send
- Property address and contract number are included
- Measured squares and unit prices match the contract
- Materials and change items are separate lines
- Deposit and earlier payments appear as credits
- Disposal and cleanup are listed
- Tax follows local rules
- Warranty note and payment terms are clear
Related templates and tools
Roofing often overlaps with exterior projects, so see the painting invoice template and the construction invoice template. When you are ready to build your own, use the free invoice generator, which runs in your browser with exact money math and no account.
PayToMe is in public beta. Sign in at app.paytome.si to create estimates and invoices, send them by email with a pay link, get paid by card or bank transfer, and choose the Free, Pro or Business plan. Reminders, cash-flow forecasts, text-to-pay and the mobile app are in development. The free invoice generator still works in your browser with no account. This page is general information, not legal or tax advice.