Skip to content

Invoice template

Electrical invoice template

An electrical invoice template that lists permits, materials and labor hours, with your license number on the page, so clients can follow the bill.

Updated · By PayToMe Editorial

Electrical invoice

DescriptionQtyAmount
Service call and troubleshooting1 ea$95.00
Labor, licensed electrician6 hr$630.00
Labor, apprentice6 hr$330.00
Electrical permit fee (passed through at cost)1 ea$120.00
20-amp GFCI outlet4 ea$88.00
12/2 NM-B cable100 ft$95.00
Single-gang boxes, covers and connectors1 lot$48.00
Panel label update and circuit directory1 ea$35.00
Total$1,441.00
Use this template

Typical terms for this trade: Due on receipt or Net 15 or Net 30

An electrical invoice template works best when it makes three things obvious: who is licensed to do the work, which costs are permits and materials, and how many hours of skilled labor went into the job. This page walks through what to put on an electrician’s invoice, how to treat permits and inspections, which payment terms are common, and the mistakes that lead to disputes. Click the “Use this template” button on this page and the free generator opens with the sample lines already filled in, ready for your own rates.

Why electrical work bills differently

Electrical work sits between a trade and a regulated activity. In most places you need a license to do it, many jobs need a permit, and some need an inspection before the work counts as finished. All three show up in the money.

The permit is a cost that belongs to the project but not to your labor. Clients often ask what it is for, and an inspector or insurer may later want a record of who pulled it. Listing it on its own line, with the permit number in the description, answers both questions.

Labor is rarely one flat category. A job may use a licensed electrician for the panel work and an apprentice for pulling cable. Billing them at different rates on separate lines is more accurate, and clients tend to accept it when it is visible.

Materials run from a ten-dollar outlet to a panel costing hundreds. Small parts like connectors and staples are tedious to itemize, so a single “sundry materials” line is acceptable if you describe what it covers and the amount is modest. Anything the client might reasonably care about, such as a subpanel or a fixture, should have its own line.

What to include on an electrical invoice

Start with the basics from our guide to what to include on an invoice, then add the details that matter for this trade.

  • Business name, address, phone and license number. Licensing rules differ by state and sometimes by city. Check your local requirements for what must be printed on documents and contracts.
  • Job site address and a short scope, in plain language: “Added four GFCI outlets in kitchen, new 20-amp circuit from main panel.”
  • Date or date range of work, and the date of any inspection.
  • Permit line, with the permit number and the fee as charged by the authority.
  • Labor lines with hours, role and hourly rate, or a quoted flat price.
  • Material lines with quantity, unit and price.
  • Trip or service call fee, if you charge one.
  • Subtotal, tax and total. Taxability of labor and materials varies. See our guide on how to add sales tax to an invoice for general pointers, and confirm with your state’s tax agency.
  • Payment terms, accepted methods and warranty note.

A worked electrical invoice

A homeowner has four new outlets installed in a kitchen remodel. The job needs a permit, a day of work from an electrician and an apprentice, and a run of cable.

INV-2217 · Kitchen outlet upgrade

ItemQtyAmount
Labor, licensed electrician6$630.00
Labor, apprentice6$330.00
Electrical permit fee (at cost)1$120.00
20-amp GFCI outlet4$88.00
12/2 NM-B cable100$95.00
Tax (7%)$88.41
Total$1,351.41

The tax rate in the example is illustrative. Whether it applies to labor, materials or both depends on where you work.

Payment terms that work for electricians

Small service calls, like replacing a breaker or fixing a dead outlet, are usually billed due on receipt. The problem is found, fixed and tested while you are on site, so there is little reason to wait.

Remodel and new-construction jobs run longer. For those, net 15 or net 30 is common, often with a deposit to cover materials and permit fees before you start. When you work for a general contractor, expect their terms, and confirm them in writing before the first day. Our guide to invoice payment terms shows how each option looks on an invoice.

For multi-week jobs, consider billing in stages, such as rough-in complete and final after inspection. The glossary entry on progress billing explains the idea, and each stage invoice should reference the original quote.

Pricing and itemizing tips

Decide how to treat permit fees. Passing the fee through at cost, as its own line, is transparent. Some contractors bundle it into a flat price. Either works if you tell the client which approach you are using before the job.

Mark up materials consistently. If you add a markup to cover sourcing and handling, apply the same method to every job so your invoices are predictable. The line should show the price you charge, not your cost.

Separate troubleshooting from repair. Finding the fault is skilled labor even when the fix is small. A diagnostic line, or a service call fee that includes the first half hour, prevents the “all that for a ten-minute fix” conversation.

Note exclusions. If the quote did not include drywall repair or paint, say so on the invoice or the quote it references.

Use clear unit labels. Cable by the foot, devices each, labor by the hour. Consistent units make an invoice scannable.

Common mistakes

  • Leaving off the license number. It is a small detail clients and inspectors look for.
  • Blending permit fees into labor. The client cannot tell what is a government charge and what is yours.
  • One blended hourly rate when apprentices and licensed electricians both worked.
  • Not referencing the quote. Changes of scope are fine, but they need an explanation.
  • Sending the invoice before the inspection passes on a job where final payment depends on it.
  • No payment instructions. Tell the client how to pay and make it a single click if you can.

Checklist before you send

  • License number and business contact details are in the header
  • Job address, work dates and inspection date are included
  • Permit appears on its own line with the permit number
  • Labor is split by role, with hours and rates
  • Materials are itemized with quantity and unit price
  • Any change from the quote is explained
  • Tax is handled according to local rules
  • Payment terms and methods are clear

Electricians often share job sites with other trades, so see the plumbing invoice template and the HVAC invoice template for how they handle similar lines. To build your own, open the free invoice generator, which runs in your browser with exact money math and needs no account.

PayToMe is in public beta. Sign in at app.paytome.si to create estimates and invoices, send them by email with a pay link, get paid by card or bank transfer, and choose the Free, Pro or Business plan. Reminders, cash-flow forecasts, text-to-pay and the mobile app are in development. The free invoice generator still works in your browser with no account. This page is general information, not legal or tax advice, so check your local licensing and tax rules.

Frequently asked questions

Should my license number be on an electrical invoice?

Many electricians print it in the header, and customers and inspectors often look for it. Rules differ by state and city, so check your local requirements.

How do I list a permit fee on an invoice?

Use a separate line with the permit number and the fee charged by the authority. That makes clear it is a pass-through cost and not part of your labor.

Can I bill apprentice and journeyman hours separately?

Yes. Separate lines at each role's rate are more accurate and easier for clients to follow than one blended hourly figure.

What payment terms suit electrical work?

Small service calls are usually due on receipt. Remodel and new-construction jobs often use net 15 or net 30, sometimes with a deposit for materials and permits.

Start getting paid at the speed of thought

Create your free account in a minute: no password, no card. Your free plan includes 100 invoices a day.

Get started free

Already have an account? The same button signs you in.

Get PayToMe updates by email

Product news and invoicing tips, now and then. Confirm your email once, and unsubscribe whenever you like.

One email to confirm. No spam, ever.